Form Architectural IncForm Architectural Inc
Home
The Process
Residential
      Projects
Commercial
      Projects
Specialty
      Projects
Publications and
      Articles
Photo Gallery
Form Architectural Inc
COMMERCIAL PROJECTS



A PARTIAL OVERVIEW AND LIST – COMMERCIAL

Ronald Reagan Presidential Museum and Library – Simi Valley, CA Discovery Center project, 4900 SF, in 4 developed areas: Mission Control Situation Room, Oval Office, Press Room & Air Force 1 Flight Simulator. Estimated cost $1.3 million plus exhibit finishes.

Atlantic Commercial Building - Cudahey, CA 8-12000 SF commercial building proposal with on grade parking and include old site improvements. Estimated cost $1.6 - $1.8 million.

FORD Graphics - West Los Angeles Offices. 8000 SF tenant improvement and re-hab of existing business. Estimated budget $800,000.00

Dromy International – Beverly Hills, CA - a southern California real estate development and management company. Work consists of Property Entitlement processing, renovation projects on a variety of commercial and residential income property and the presentation before various commissions for approvals and entitlement requirements. Eli Dromy & Ziggy Dromy, Owners.

Soledad Canyon Carwash – Santa Clarita, CA. – A new carwash and automotive detailing facility. Site development includes grading, retaining walls, vacuuming and dry-off canopy area. The project was processed through the planning approval phase by the developer with the designs and exhibits produced by this office. Structural area consists of 18,000 SF on a 2 acre site. Estimated budget $2.6 million. [photos]

CDI Equipment - San Diego, CA. (project) Preparation of design and drawings for 6000 SF Administrative addition and modifications to the present Precision Machine Shop for High Performance Racing Motors. Project included processing use permits and construction permits. Value of construction at $600,000.00

Scenic Expressions- Glendale, CA. Preparation of RETRO-FIT structural analysis to comply with the Los Angeles Building Code for structural concrete tilt up buildings. Project completed 4/01.

Kentucky Fried Chicken Restaurant (freestanding) - San Fernando, CA. Preparation of Architectural drawings from conditional design approval through the end of construction. Site work included parking, landscaping and coordination with existing parking lot. Construction Value +- $950,000.00

Dental Offices for Dr. Levesque - Ventura County, CA. Preparation of addition and remodel design for dental offices from existing residence. Up grade exterior design, Cape Cod Design. Architectural and Structural work totaling $180,000.00

Louise Townhomes West Condominium - Northridge, CA; Repair earthquake damage interior & exterior, 37 unit development. Value estimated at 1.4 million; Construction completed 8/95. In house construction crews managed the project from start to finish. Construction completed in 1995.

Delfino Studios – Sylmar, CA General consulting for improvements in and around the studio facility for structural remodeling, tenant improvements, and technical renovations.

CHURCH PROJECTS

Livingstone Christian Fellowship – Mission Hills, CA Addition and Remodel to accommodate Senior Daycare Activities, including variance processing and ADA compliance. Estimated Budget $2 million. Pastor David Leon

Filipino Bible Christian Church - Reseda, CA New Church building and sanctuary for 150 seats, totaling 8,000 SF. Site development, conditional use permit processing and off site civil engineering. Estimated budget $1.3 million.

Youth With A Mission – Lake View Terrace, CA Re-construction of existing Coffee Lounge/Bookstore, toilet facilities, and separate building for Administrative offices. Building area approximately $2,700 SF Estimated budget : $170,000.00

El Camino Pines Church - Fraiser Park, CA New church building and Sanctuary totaling 4,500 SF Estimated budget of $220,000.00 Dale Best, Project Manager for Church Board

Reseda Blvd. Church of Christ – Reseda, CA Sanctuary expansion, Interior renovation and accessory room addition to existing church building. Renovations included ADA compliance, Fire safety and Zoning compliance issues.—Work area totals +-8,000 SF. Estimated budget of $900,000.00 Pastor Dewayne Winrow

Shepherd of the Valley Lutheran Church and School ; SOCIAL HALL AND ADMIN. OFFICES - West Hills, CA. A follow-up phase to the other projects listed below to include an expansion and remodel of the existing administrative areas of the church/school operation, the addition of Youth and Senior Social Hall spaces, the work totaling +-6,000 SF. Estimated budget of $550,000.00. Jan Garris, Project Manager for the church and Bryan Woken, Pastor [photos]

North Hollywood Church of Religious Science – North Hollywood, CA. Master plan entire facility, design remodel and addition for 550 seats plus education building and social hall. Estimated budget: $5,000,000.00 [photos]

Hollywood-Beverly Christian Church - Hollywood, CA. Processing difficult permit documents for property modifications, including the construction management for the improvements required within the approval permits. Negotiations with the City for mitigating alterations to required code requirements. Pas. Peggy Clark.

Woodley Avenue Baptist Church – North Hills, CA Interior sanctuary remodel including new technology and ADA compliance issues. Estimated budget $100,000.00

Michael Archangel Coptic Church- Moorpark, CA. Preparation of design and drawings for 2200 SF expansion to the existing sanctuary. Project includes the processing of the use permit modifications and master planning for the proposed social hall expansion in a future phase. Construction value at $650,000.00. (PROJECT)

Village Church- Newhall, CA. Preparation of design and drawings for 6000 SF Social Hall and Christian Education Building. Project included processing special use permits and construction management. Value of construction at $1.2 million. Rev. Andre Veluzat

Simi Valley Church of the Nazarene - Simi Valley, CA. Preparation of Master Plan Design for property development, process Conditional Use Permits and Design new Sanctuary Project. Pastor Kim Richmond.

Burbank Foursquare Church – Burbank, CA. Preparation of Master Plan Analysis, Phased design for systems installation, training & service for the new systems. Project valuation $280,000.00. Pastor Phillip Hyde.

Shepherd of the Valley Lutheran Church and School - West Hills, CA. Preparation of addition and remodel design for school and general facilities remodel. Phase 2 work included the renovation of the Main Sanctuary including Lighting & Sound system. Pastor Bryan Woken.

Mission Hills Foursquare Church (LIVINGSTONE CHRISTIAN FELLOWSHIP) - Mission Hills, CA. Preparation of Master Plan for new church and day-school campus. Initiated application process within the City of Los Angeles and established design parameters for land use approvals. David Leon, Pastor.

Cornerstone Christian Church - Northridge, CA. Preparation of Master planning concepts and budget analysis for growth and expansion objectives. Ron Nagin, Sr. Pastor.







 

 

WE SERVE OUR CLIENTS

Form Architectural© Copyright 2006

ONTRIX SOLUTIONS